The subject of the contract is successive collection, transport and management of waste code 19 12 12 - Other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11 from a stream of unsegregated (mixed) municipal waste separated on the line of waste segregation of the Waste Management Plant in Łasków.
4.1. The subject of the contract is successive acceptance, transport
and waste management code 19 12 12 - Other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11 coming from the stream of unsegregated (mixed) municipal waste separated on the waste segregation line of the Waste Management Plant in Łasków.
4.2. The estimated amount of waste during the term of the contract will be
up to 4 000 Mg. This quantity was determined for the purpose of estimating the value of the contract. The Ordering Party reserves the right to reduce the amount of waste collected without the right to pursue claims. The minimum guaranteed amount of waste is 1 000 Mg . The actual amount of waste to be collected will result from the current needs of the Ordering Party.
4.3. Waste with code 19 12 12 covered by the subject of the contract will constitute waste of the over-sieve fraction with a diameter of more than 80 mm, as a calorific sorting material intended for the production of alternative fuel RDF, after separation of blocking waste and after manual segregation on the sorting line and separation of ferrous metals. The waste covered by the subject of the contract will be predominantly in the form of pressed cubes with dimensions of approx. 80 cm x 100 cm x 110 cm, which will be tied with steel wire or occasionally in a loose form without pressing.
4.4. Reception of waste will take place on working days from Monday to Friday from 6:00 to 22:00 from the site of Waste Management Plant in Łasków, 22-530 Mircze, Łasków 69 by the Contractor's own transport. The contracting agent shall ensure the loading of waste. Weighing of waste received by the Contractor will take place on the weight of the Ordering Party, located in the Waste Management Plant in Łasków, Łasków 69 and will be confirmed by the weight quota from the weighing system and the generated confirmation of the generation of the waste transfer card according to with BDO system guidelines.
4.5. Any transport of waste received by the Contractor will be checked in the Contracting Authority's weight system and in the BDO system.
4.6. After the end of each calendar month, the Ordering Party will transmit to the Contractor a weighing balance derived from a computer program supporting the weighing system in the ZZO in Łasków.
4.7. The offered waste management method must be in accordance with applicable law and recovery processes listed in Annex 1 to the Act of 14 December 2012 on waste (i.e. Journal of Laws of 2022, item 699, as amended)
4.8. The Contractor will be obliged to confirm the recovery of the received waste and provide written information about the process of recovery from the received waste from the Contracting Authority.