Geothermal energy at the location Schwerin Lankow - planning services for thermal engineering, here: building electrical equipment (lot 7.1), building equipment water / wastewater / heating (lot 7.2) and building equipment fire protection / gas warning systems (lot 7.3) in accordance with the HOAI "technical equipment".
The upcoming project includes the construction of an engineering structure consisting of filter units, heat exchangers, heat pumps, the thermal water circuit and ancillary equipment (pumps, valves, pipelines, etc.) as well as related control equipment and connection to a medium voltage switchgear. The technical systems must be able to work with the thermal oil circuit to produce the production well as well as a separate brine connection line and the injection well connected to it. Furthermore, the civil engineering systems are to be connected to the district heating network.
The geothermal center is to be planned with a control system, which ensures the remote controllability of the combined heat and power plants Schwerin South and Schwerin Lankow.
The brine pipeline is to be planned through a drinking water protection zone IIIa and IIIb and will connect the geothermal center with the injection well. The cable length is approx. 1 000 m. The brine pipeline is to be planned with a multiple leak monitoring.
The upcoming project includes the construction of an engineering structure consisting of filter units, heat exchangers, heat pumps, the thermal water circuit and ancillary equipment (pumps, valves, pipelines, etc.) as well as related control equipment and connection to a medium voltage switchgear. The technical systems must be able to work with the thermal oil circuit to produce the production well as well as a separate brine connection line and the injection well connected to it. Furthermore, the civil engineering systems are to be connected to the district heating network.
The geothermal center is to be planned with a control system, which ensures the remote controllability of the combined heat and power plants Schwerin South and Schwerin Lankow.
The brine pipeline is to be planned through a drinking water protection zone IIIa and IIIb and will connect the geothermal center with the injection well. The cable length is approx. 1 000 m. The brine pipeline is to be planned with a multiple leak monitoring.
The upcoming project includes the construction of an engineering structure consisting of filter units, heat exchangers, heat pumps, the thermal water circuit and ancillary equipment (pumps, valves, pipelines, etc.) as well as related control equipment and connection to a medium voltage switchgear. The technical systems must be able to work with the thermal oil circuit to produce the production well as well as a separate brine connection line and the injection well connected to it. Furthermore, the civil engineering systems are to be connected to the district heating network.
The geothermal center is to be planned with a control system, which ensures the remote controllability of the combined heat and power plants Schwerin South and Schwerin Lankow.
The brine pipeline is to be planned through a drinking water protection zone IIIa and IIIb and will connect the geothermal center with the injection well. The cable length is approx. 1 000 m. The brine pipeline is to be planned with a multiple leak monitoring.