Subject of the invitation to tender are planning services in the performance area § 55 HOAI - groups of facilities 1, 2, 3, 7 and 8 for the new construction of the "Campus Handwerk".
On the grounds of the education and technology center (BTZ) of the Chamber of Crafts Halle (Saale) in Halle-Osendorf, a new building is to be built including the existing substance to the "Campus Handwerk" with the design of the outdoor facilities The aim is that the current BTZ as a training location with The aim is to find alternative ideas and optimized concepts for the implementation of high-quality, rational and economical construction methods and sustainable building technology Adapting the number of trainees and, if necessary, changing the requirements for use, climate-friendly solutions, taking into account economic aspects and the innovative integration of renewable energy conversion, are expressly desired.
The solution for the necesary and reconstruction measures necessary for this (administration and boarding houses, training workshops, open spaces) will be provided in the framework of a currently running architectural competition in the form of a campus-like area on an area of about 3 hectares, taking into account a contemporary architecture and landscape planning with innovative Integration of renewable energy transformations found. A flexible usability of the newly designed training workshops is aimed at.
At a planned GFA of approx. 8,600 m
The planning of the technical building equipment is to be carried out as a holistic concept on the concerns of the AG in the sense of a usable variant with regard to the individual training disciplines. Here, the following additional information about the basic services according to HOAI are given in advance for individual trades, which must be observed and implemented (not conclusive):
KG 410 investigation and evaluation of greywater utilization plant,
- KG 420 Different variants of the primary energy production with investigation of different energy carriers (FW connection not possible),
- KG 430 Planning of the exhaust air system workshops with consideration of after-cooling and under ceiling extraction,
- KG 470 compressed air system (s) Oil-free and normal, investigation on the use of waste heat,
- KG 480 building management system with integration of the building stock, visualization and possible integration into the apprenticeship / master craftsman education,
- KG 540 if necessary rainwater retention system with throttling drain / percolation system.
The application and construction documents for the construction examination must be handed over to the AG on April 30, 2020. The in II.2.7. specified term refers to this date. The gradual start of use of the project is planned from 2021.
The awarding authority / client expects that in the case of an assignment the offered project team will be available immediately and in full to ensure the scheduling. If necessary, an increase in the strength of the team must be secured / made possible to ensure that deadlines are met.