The subject of the contract is the performance - under the conditions described in the contract to be concluded between the Ordering Party and the Contractor, SWZ and in the Contractor's offer - of waste recovery, collected by the Contractor from the Ordering Party, classified under code 19 12 12 - other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11 with a division into tasks (parts) in the types and quantities specified below. Waste may only be subjected to R1 and/or R12 recovery operations, in accordance with the designation of these processes in the Waste Act of 14.12.2012. (i.e. OJ 2022.699, as amended)/Annex IA to Regulation (EC) No 1013/2006 of the European Parliament and of the Council of the European Union of 14.6.2006. on shipments of waste (OJ EU. L 190/1 with late. as amended), whereby 'recovery operation' means the commencement and completion of that process.
Part No. 1 - Waste in the amount of 3350 Mg (+/-) 10 MgThe subject of the contract is the performance - under the conditions described in the contract to be concluded between the Ordering Party and the Contractor, SWZ and in the Contractor's offer - of waste recovery, collected by the Contractor from the Ordering Party, classified under code 19 12 12 - other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11 with a division into tasks (parts) in the types and quantities specified below. Waste may only be subjected to R1 and/or R12 recovery operations, in accordance with the designation of these processes in the Waste Act of 14.12.2012. (i.e. OJ 2022.699, as amended)/Annex IA to Regulation (EC) No 1013/2006 of the European Parliament and of the Council of the European Union of 14.6.2006. on shipments of waste (OJ EU. L 190/1 with late. as amended), whereby 'recovery operation' means the commencement and completion of that process.
part No. 1 – in the amount of 3350 Mg (+/-) 10 Mg (quantitative differences may result from storage conditions and from the technical and technological solutions of the weighing system), but not less than 200 Mg (minimum benefit)
Waste Packaging: Baled waste, i.e. pressed and then baled wrapped with a mesh and polyethylene film.
Receipt of waste:
The transfer and receipt of Waste shall be carried out solely on the basis and in accordance with written [form under the rigour of annulment] of the Ordering Party unit orders to the Contractor and served by fax or e-mail, specifying the quantity of Waste and the time limit on which The Ordering Authority expects their receipt.
The Ordering Party will place unit orders when the amount of Waste collected by him, which is to be collected on one day, will be a minimum of 12 Mg in the case of parts 1 and 2.
The Contractor shall receive the waste while maintaining the following technical infrastructure requirements at the contracting plant:
• the gross weight of a single vehicle entering the premises of the Ordering Party (empty vehicle for loading) may not exceed 18 tons
• the distances between the extreme axles of a single vehicle must not exceed a length of 16 meters, and the length of the vehicle will not exceed 18 m
• loading of bulk waste takes place "from above".
Part No. 2 - Waste in the amount of 3350 Mg (+/-) 10 MgThe subject of the contract is the performance - under the conditions described in the contract to be concluded between the Ordering Party and the Contractor, SWZ and in the Contractor's offer - of waste recovery, collected by the Contractor from the Ordering Party, classified under code 19 12 12 - other waste (including mixed substances and objects) from mechanical waste treatment other than those listed in 19 12 11 with a division into tasks (parts) in the types and quantities specified below. Waste may only be subjected to R1 and/or R12 recovery operations, in accordance with the designation of these processes in the Waste Act of 14.12.2012. (i.e. OJ 2022.699, as amended)/Annex IA to Regulation (EC) No 1013/2006 of the European Parliament and of the Council of the European Union of 14.6.2006. on shipments of waste (OJ EU. L 190/1 with late. as amended), whereby 'recovery operation' means the commencement and completion of that process.
part No. 2 – in the amount of 3350 Mg (+/-) 10 Mg (quantitative differences may result from storage conditions and from the technical and technological solutions of the weighing system), but not less than 200 Mg (minimum service)
Waste Packaging: Baled waste, i.e. pressed and then baled wrapped with a mesh and polyethylene film.
Receipt of waste:
The transfer and receipt of Waste shall be carried out solely on the basis and in accordance with written [form under the rigour of annulment] of the Ordering Party unit orders to the Contractor and served by fax or e-mail, specifying the quantity of Waste and the time limit on which The Ordering Authority expects their receipt.
The Ordering Party will place unit orders when the amount of Waste collected by him, which is to be collected on one day, will be a minimum of 12 Mg in the case of parts 1 and 2.
The Contractor shall receive the waste while maintaining the following technical infrastructure requirements at the contracting plant:
• the gross weight of a single vehicle entering the premises of the Ordering Party (empty vehicle for loading) may not exceed 18 tons
• the distances between the extreme axles of a single vehicle must not exceed a length of 16 meters, and the length of the vehicle will not exceed 18 m
• loading of bulk waste takes place "from above".