AKN Heidberg, 17-038, restructuring of house 3 (flooring work)
The ASKLEPIOS Klinik Nord - Heidberg intends to carry out a restructuring in building 3. For this purpose, new bed rooms are created on the ground floor to floor 2. A central changing room is built in the basement. Fire protection work is carried out in OG3.
Quantity unit performance 392 m 2 Pick up and dispose of the floor covering; Mill the subsurface 3 104 m 2 Leveling of bed surfaces; Layer thickness 2-3 mm 280 m 2 Rubber flooring; R10; Tile 100 x 100 cm; d = 3.5 mm; including subsoil treatment and initial maintenance 2 354 m 2 Rubber flooring; R9; Tile 100 x 100 cm; d = 3.5 mm; including substrate treatment and initial maintenance 318 m skirting board made of rubber covering R10; Tiled goods; H = 10 cm 2,282 m skirting board made of R9 rubber flooring; Tiled goods; h = 10 cm 470 m 2 Multi-layer PVC-free covering; R10; Plank ware; d = 2.5 mm; including substrate treatment and initial maintenance 456 m skirting board, wooden profile; h = 10 cm 3 104 m 2 Protective cover floor coverings.