Renovation of Teckschule Wernau (3.BA) and renovation of kindergarten "Haus des Kind" - ventilation installation
The construction site is located in the area of the area of the "Teckschule".
The school building is to be completely renovated in 3 construction phases, the subsequent kindergarten "House of the Child" is also to be renovated.
The present list of services includes the work in the 3rd construction phase of the school building (extension basement and ground floor) as well as in the kindergarten "House of the Child" (ground floor).
It is a solid building from the 1960s.
School building area
Outer walls:
Masonry, concrete
Cover:
via basement: ribbed ceiling and concrete ceiling
above ground floor: ribbed ceiling
Kindergarten area
Outer walls:
Masonry, concrete
Cover:
above ground floor: reinforced concrete ribbed ceiling and concrete ceiling
The building services are completely renewed.
The building envelope (windows, roof surfaces and facades) will be preserved. Floor plan changes and modernizations are made.
In the buildings adjacent to the construction site, school operations will continue.
Extent of the work:
Decentralised ventilation unit 500 m3/h 3 pcs
Decentralised ventilation unit 725 m3/h 1 pcs
Central ventilation unit 500 m3/h 3 pcs
Central ventilation unit 900 m3/h 2 pcs
Central ventilation unit 2,000 m3/h 1 pcs
Air ducts and fittings 90 sqm
Ventilation pipes DN 100 to DN 400 240 lfm
Ventilation grilles and air outlets 90 pcs
Fire dampers round DN 250 3 pcs
Foam insulation 90 sqm
Sheet metal insulation weatherproof 40 sqm