Design and construction of the S19 expressway on the Lutcza section — in Domaradz (with junction) length approx. 6.43 km
As part of the order, you must design and build:
• expressway with dual-carriageway section length approx. 6.43 km
• road junction: “Domaradz”
• Road Maintenance Circuit (OUD) “Domaradz”
• T-3 double-aisle road tunnel running under Mount Hyb with a length of 0.99km
• Tunnel Management Center with equipment
• technical buildings at the tunnel with equipment,
• road engineering facilities;
• reconstruction of existing roads in terms of collision with route S19;
• additional roadways serving the adjacent area;
• hardening of the site for maintenance purposes;
• technical roads,
• infrastructure for pedestrians and cyclists;
• environmental protection devices including animal passages;
• acoustic, anti-dazzle and windward screens;
• infrastructure for the needs of facilities located within the expressway, including: power and lighting networks, rainwater sewerage including cleaning equipment, water and wastewater pumping stations, technology channels and others;
• reconstruction of colliding equipment and networks of existing underground and above-ground infrastructure — demolition of buildings and structures;
• road marking and road safety equipment;
• traffic management system on the road and tunnel;
• technological channels;
• plantings of greenery;
• other preparatory, auxiliary and organizing work.
Above €5,382,000.