Construction of a new section, construction of a further section without a bonded superstructure, construction of three temporary rainwater retention basins with inlets and outlets
Removal of topsoil approx. 37,000m³
Topsoil covering approx. 12,000m³
Einsaat rd. 65.000m²
Erosionsschutzgewebe rd. 40.000m³
Loosening and installing the floor approx. 42,000m³
Loosening and recycling soil approx. 40,000m³
Soil replacement approx. 4,000m³
Soil improvement approx. 50,000m³
Installing waterproofing approx. 17,000m³
Geotextil rd. 43.000m²
Making troughs approx. 4,000m
Frostschutzschicht rd. 17.000m³
Asphalttragschichten rd. 14.000m²
Asphaltbinderschicht rd. 13.000m²
Asphaltdeckschichten rd. 14.000m²
Asphalttragdeckschicht rd. 1.900m²
Water-bound ceiling approx. 8,000m²
Banquets approx. 4,500m
Sewer pipes with shafts DN150-500 approx. 4,100m
Rohrvortrieb DN600 rd. 30m
Sickerleitungen rd. 3.000m
Earthworks for rainwater retention basin approx. 8,000m³
Waterproofing in pools approx. 3,000m²
Throttle and slide shafts 3 pcs.
Produce steel sheet piles approx. 2,000m²
Replacement boreholes for sheet piling approx. 1,300m
Slope stabilization with hydrocementation method approx. 3,000m³
Slope protection with seepage support discs approx. 1,000m³