Timber construction/façade/roof workTimber construction, façade and roof work for the construction of a new after-school care centre and lunchtime care with underground parking in Unterföhring.
Building length/width: approx. 65/30m, gross volume (BRI): approx. 20,800m³.
Timber construction work: approx. 3,000m² cross-laminated timber walls, approx. 2,800m² glulam ceilings (mainly as wood-concrete composite ceilings), as well as columns, beams, timber and panel materials.
Roof work: approx. 1,600m² warm roof, approx. 800m² sealed roof surfaces in the cold area.
Façade: approx. 1,600m² ventilated curtain wall façade with wood cladding, approx. 600m² wood-aluminium-glass facades, as well as plumbing work.
Timber construction, façade and roof work for the construction of a new after-school care centre and lunchtime care with underground parking in Unterföhring.
Building length/width: approx. 65/30m, gross volume (BRI): approx. 20,800m³.
Timber construction work: approx. 3,000m² cross-laminated timber walls, approx. 2,800m² glulam ceilings (mainly as wood-concrete composite ceilings), as well as columns, beams, timber and panel materials.
Roof work: approx. 1,600m² warm roof, approx. 800m² sealed roof surfaces in the cold area.
Façade: approx. 1,600m² ventilated curtain wall façade with wood cladding, approx. 600m² wood-aluminium-glass facades, as well as plumbing work.