Renovation, partial demolition and partial new construction of the triple gymnasium
Execution in several construction phases according to components (component A-E)
built up area approx. 55x51 m
3 storeys (KG, ground floor)
Start of the measure July 2023
End of action September 2025
Services mullion façade, windows + doors:
- Aluminium mullion façade
- Dismantling windows/doors
- Pfostenriegelfassade Eingangsfassade Nord 26,49x4,205 m
- Post-transom façade window strip north 23.58x2.05 m
- Post-transom façade east 51.92x2.53 m
- Window element north 88.5/253 cm, 2 pieces
- Window element north 88.5/205 cm, 1 piece
- Window element east 363.5/110 cm, 5 pieces
- Window element east 332,5/110 cm. 10 pieces
- Window element south atrium 825/180 cm, 1 piece
- Window element south atrium 451/230 cm, 1 piece
- Window element south staircase 60/100 cm, 3 pieces
- Window element south washrooms 100/70 cm, 2 pieces
- Window element F90 north multifunctional room 435/168.5 cm, 5 pieces
- Exterior doors steel-glass, 1-flgl. 13 pieces
- Exterior doors steel-glass, 2-flgl. 11 pieces