Planning services Technical equipment for: New building "Centre for the Study of Phase Transitions"
Chronic diseases" - ZPCE [Aachen]
Specialist planning of technical equipmentThe order includes freelance planning services.
The following services are to be awarded:
n Technical equipment (work phases 1 - 9 according to HOAI § 55 in conjunction with Annex 15;
Anlagengruppen 1 - 8).
The required services are based on the performance profiles of the HOAI. The
The client reserves the right to commission the contract in stages and, if necessary, by construction phase.
Specialist planning laboratoryThe order includes freelance planning services.
The following services are to be awarded:
n Technical equipment (work phases 1 - 9 according to HOAI § 55 in conjunction with Annex 15;
Anlagengruppe 7 (Laborplanung)).
The required services are based on the performance profiles of the HOAI. The
The client reserves the right to commission the contract in stages and, if necessary, by construction phase.
The services are called up in stages:
- Stage 1: Performance phases 1-3
- Level 2: Performance phase 4
- Level 3: Performance phase 5-7
- Level 4: Performance phase 8
- Level 5: Performance phase 9