Major works:
- manufacture, provision dismantling of a scaffolding ramp, housed, roofed, approx. L / W / H30 m / 1.70 m / 2.50 m,
- demolition foundations reinforced concrete / concrete about 10/10 t,
- loosen the soil, convey it, transport it: approx. 310 m
- Working areas, backfill with sand / gravel mixture: approx. 290 m
- demolition and dismantling: steel construction existing ramp: about 24 tons,
- demolition parapets made of steel / glass: approx. 25 m
- demolition asphalt deck and
- supporting layers: approx. 1 ton,
- In-situ concrete for new ramp and its supporting walls / columns / parapets / ceilings: approx. 83 m
- Formwork for new ramp and its supporting walls / columns / parapets / ceilings: approx. 354 m
- Anchor + injection system: approx. 500 pieces,
- Reinforcing steel for new ramp and its supporting walls / columns / parapets / ceilings: approx. 14.7 tonnes,
- new asphalt layers: approx. 60 m
- OS-8 coating of the traffic areas of the new reinforced concrete ramp: approx. 180 m
Major works:
- manufacture, provision dismantling of a scaffolding ramp, housed, roofed, approx. L / W / H30 m / 1.70 m / 2.50 m,
- demolition foundations reinforced concrete / concrete about 10/10 t,
- loosen the soil, convey it, transport it: approx. 310 m
- Working areas, backfill with sand / gravel mixture: approx. 290 m
- demolition and dismantling: steel construction existing ramp: about 24 tons,
- demolition parapets made of steel / glass: approx. 25 m
- demolition asphalt deck and
- supporting layers: approx. 1 ton,
- In-situ concrete for new ramp and its supporting walls / columns / parapets / ceilings: approx. 83 m
- Formwork for new ramp and its supporting walls / columns / parapets / ceilings: approx. 354 m
- Anchor + injection system: approx. 500 pieces,
- Reinforcing steel for new ramp and its supporting walls / columns / parapets / ceilings: approx. 14.7 tonnes,
- new asphalt layers: approx. 60 m
- OS-8 coating of the traffic areas of the new reinforced concrete ramp: approx. 180 m