The subject of the Order is:
Construction of a high-performance heating connection in the technology of conti pre-insulated pipes with a pulsed alarm system to the building at 81 Kozielska Street in Kędzierzyn – Koźle (the length of the connection is about 110 meters, inclusion in the pre-insulated network 139.7/225). The situation plan with the connection route is presented in Annex 1 to the SWZ.
The connection will be implemented in accordance with Article 29a point 1 of the Construction Law.
The subject of the Order is:
Construction of a high-performance heating connection in the technology of conti pre-insulated pipes with a pulsed alarm system to the building at 81 Kozielska Street in Kędzierzyn – Koźle (the length of the connection is about 110 meters, inclusion in the pre-insulated network 139.7/225). The situation plan with the connection route is presented in Annex 1 to the SWZ.