Bridge-design services | Tenderlake

Bridge-design services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
31 October 2019
Closing Date:
29 November 2019
Location(s):
DEE02 Halle (Saale), Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Replacement new Elisabeth Bridge, planning services, A 2019/02

The object of the award is the planning of the replacement of the Elisabeth Bridge (flood aid measure) taking into account the complex project Mansfelder Straße West (light rail program, project 2.2) in Halle (Saale).

The object of the award is the planning of the replacement of the Elisabeth Bridge (flood aid measure) taking into account the complex project Mansfelder Straße West (light rail program, project 2.2) in Halle (Saale).

The contracting authority is the Hallesche Verkehrs-AG (HAVAG), the site owner of the bridge structure is the city of Halle (Saale).

The work phases 1-3 §§ 26, 43 and the performance phases 2-3 § 51 (HOAI 2013) and Lph 1-4 of the appendices 1.3 and 1.4 HOAI 2013 are to be processed. Subsoil investigations in situ or in the laboratory are also necessary Extend scope. As an option, the client reserves the phased commissioning up to Lph 4 (§ 26 HOAI 2013), 7 (§ 43 HOAI 2013) and Lph 6 (§ 51 HOAI 2013). There is no legal claim to commission the optional services.

The bridge structure crosses the Mansfelder Straße via the Elisabethsaale. The bridge structure is used by trams and (night) bus lines of HAVAG, motorized local traffic, cyclists and pedestrians. The functions are to be retained in the replacement construction, with variants of the road cross-section to be examined in the course of planning. The replacement building is to be planned according to the state of the art.

As part of the Halle light rail program, planning is currently underway for the 2.2 Mansfelder Strasse West project. This project includes the track section between Herrenstraße in the east and Rennbahnkreuz in the west. The subject of the planning are the railway tracks along with technical equipment, traffic facilities of the city Halle (Saale) as well as the line construction. The planning of the replacement of the Elisabeth Bridge is to be coordinated with the planning of the traffic facility.

The Mansfelder Straße, in the course of which lies the Elisabeth Bridge to be renovated, is a heavily used, important connection for the tram in the direction of Halle Neustadt and Halle city center. Therefore, operational restrictions or blockages from the replacement of the bridge to minimize. Already in the Lph 2, construction phases and operational intermediate states are to be examined and weighed against each other for all variants.

The bridge construction lies in the landscape protection area "Saaleaue". It is also located in the flood area of the Saale. The resulting special requirements for planning and construction of the bridge structure must be observed. Coordinations with the responsible specialist offices of the city of Halle (Saale) and the state of Saxony-Anhalt as well as other TÖBs are to accompany the planning. The documents for the general preliminary examination of the individual case of the EIA obligation in accordance with the UVPG (Federation) must be compiled in agreement with the competent authority.

Basis for the scope of services of planning and optional services is the fee structure for architects and engineers (HOAI), as of 2013. The planning contract includes:

- § 26 LBP Lph 1-3, optional Lph 4,

- § 43 Engineering Structures Lph 1-3, optional Lph 4-7 (single),

- § 51 structural design Lph 2-3, optional Lph 4-6 (single),

- Annex 1.3 Geotechnics Lph 1-4,

- Appendix 1.4 Measurement Lph 1-4,

- Subsoil investigation in situ / laboratory.

Download full details as .pdf
The Buyer:
Hallesche Verkehrs-AG
CPV Code(s):
71322300 - Bridge-design services