Engineering services | Tenderlake

Engineering services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 August 2019
Closing Date:
05 September 2019
Location(s):
DEE0C Salzlandkreis (DE Germany/DEUTSCHLAND)
Description:
Schedule for: "AB Saaledeich li. km 0.0-8.35 and NB Qualmdeiche Saaledeich left. km 0.0-5.5 "

The planning area is located in the estuary of the Saale in the Elbe and was affected during the HW event in 2013 by significant pressure and smoke outlets. There were large-scale watering on, even in the local situation. The existing receiving water did not manage to discharge the accumulating amounts of water without damage.

During the flood event, it was found that the only selective accessibility of the dike systems represents a significant deficiency in the defense of dikes.

Checking the dyke systems showed that they do not comply with the current regulations (DIN 19712) in the planning area. A renovation of the HW protection systems is urgently needed to eliminate the existing deficits.

The total project was divided into 3 lots:

- Lot 1 AB Saaledeich li. km 0.0-3.5,

- Lot 2 AB Saaledeich li. km 3,5-8,35,

- Lot 3 NB Qualmdeiche Saaledeich left km 0.0-5.5.

The estimated total construction costs (lot 1-3) for the KG 200-500 amount to approx. 14,840,756.00 EUR net.


Lot 1 AB Saaledeich li. km 0.0-3.5

- the compliance of the dyke on the existing route to improve the stability,

- elimination of deficits,

- Elimination of internal and external damage to the dike by floods in 2002 and 2013,

- improvement of dike defense in flood situations,

- a dike relocation between the current dike kilometers 0 + 250 and 2 + 000 on the new route.

Possibly. necessary small - scale adjustments to the facilities of the public authorities include in

Individual the following services:

a) Design of the civil engineering work phases 1-8 to in accordance with Part 3 Section 3 of the HOAI 2013,

Honorary Zone II, all basic services and special services, the latter optional

b) HOAI 2013, Part 4 Specialist Planning, Section 1, Structural Design § 51 HOAI; Performance picture Structural design

Dike construction: Honorarone 1, service phase 1 - 6, minimum rate, all basic services and special services, the latter optional

c) HOAI 2013, Part 2 Land Use Planning, Section 2 Landscape Planning; § 26 HOAI, Landschaftspflegerischer

Accompanying plan, fee zone 2, minimum rate LP1 - 4 § 26, reference to Annex 7 HOAI, all basic services and special services, the latter

optional

Special services:

- create tasks for further required freelance work for the project,

- evaluating offers for further required professional services for the project with proposed allocation,

- to co-ordinate the other required professional services for the project,

- Checking and valuing ancillary offers when awarding construction works.

Consulting services:

- Ecological construction management - Optional,

- Creation and maintenance of a web-based user platform for planners, clients, etc., filing of all relevant project documents according to predefined structure - optional,

- Building survey for the Digital Dike Book (DDB) - Optional.

The estimated total construction costs for the KG 200-500 for lot 1 are about 4 550 000,00 EUR net (see also II.2.6).


Lot 2 AB Saaledeich li. km 3,5-8

On the existing road to improve stability

- elimination of deficits,

- Elimination of internal and external damage to the dike by floods in 2002 and 2013,

- Improvement of dike defense in flood situations.

Possibly. The necessary small-scale adaptations to the facilities of the public authorities include in detail the following services:

a) Design of the civil engineering work phases 1-8 to in accordance with Part 3 Section 3 of the HOAI 2013, Honorar Zone 2;

b) HOAI 2013, Part 4 Specialist Planning, Section 1, Structural Design § 51 HOAI; Performance picture Structural design of the dike structure: Honorarone 1, performance phase 1 - 6, minimum rate;

c) HOAI 2013, Part 2 Land Use Planning, Section 2 Landscape Planning; § 26 HOAI, landscape management plan, fee zone 2, minimum rate LP1 -4 § 26, reference to Annex 7 HOAI

Special services:

- create tasks for further required freelance work for the project,

- evaluating offers for further required professional services for the project with proposed allocation,

- to co-ordinate the other required professional services for the project,

- Checking and valuing ancillary offers when awarding construction works.

Consulting services:

- Ecological construction management - Optional,

- Creation and maintenance of a web-based user platform for planners, clients, etc., filing of all relevant project documents according to predefined structure - optional,

- Building survey for the Digital Dike Book (DDB) - Optional.

The estimated total construction cost for the KG 200-500 for lot 2 is about 5 200 000,00 EUR net (see also II.2.6).


Lot 3 NB Qualmdeiche Saaledeich li. km 0.0-5.5

- the compliant construction of smoke dikes on the previously determined and approved route.

Individual the following services:

a) Design of the civil engineering work phases 3-8 until according to Part 3 Section 3 of the HOAI 2013,

Honorary Zone 2

b) HOAI 2013, Part 4 Specialist Planning, Section 1, Structural Design § 51 HOAI; Performance picture Structural design

Dyke construction: Honorary Zone 1, service phase 1 - 4, minimum rate

c) HOAI 2013, Part 2 Land Use Planning, Section 2 Landscape Planning; § 26 HOAI, Landschaftspflegerischer

Accompanying plan, fee zone 2, minimum rate LP1 -6 § 26, reference to Annex 7 HOAI

Special services:

- create tasks for further required freelance work for the project,

- evaluating offers for further required professional services for the project with proposed allocation,

- to co-ordinate the other required professional services for the project,

- Checking and valuing ancillary offers when awarding construction works.

Consulting services:

- Ecological construction management - Optional,

- Creation and maintenance of a web-based user platform for planners, clients, etc., filing of all relevant project documents according to predefined structure - optional,

- Building survey for the Digital Dike Book (DDB) - Optional.

The estimated total construction costs for the KG 200-500 for lot 3 are about 5 090 756.00 EUR net (see also II.2.6).

Download full details as .pdf
The Buyer:
Landesbetrieb für Hochwasserschutz und Wasserwirtschaft Sachsen-Anhalt (LHW) Vergabestelle Nord
CPV Code(s):
71300000 - Engineering services