Construction work of a conservatory of music, dance and dramatic art broken down into 10 lots with a social integration clause (except lots 7, 9 and 10). A mandatory site visit is scheduled for March 2, 9 and 16, 2023 for lots 1, 6 and 8. Lot 1 is entered into a framework agreement with purchase orders with a maximum amount (excluding tax).
demolition - asbestos removal - cleaning / Earthworks - foundations - structural work / Site installation / vrd - green space / Wood and metal structure / Sealing - roofing / Treatment of facadesframework agreement with purchase orders executed partly at fixed prices and partly on purchase orders for asbestos removal work. Maximum amount over the duration of the contract: 8,000,000 (excluding tax). This lot is subject to a social integration clause, the implementation of which is indicated to the CCAC. This lot includes 1 possible additional service (PSE)
ArmchairsAuditorium chairs
exterior joinery - blackouts / Locksmithing - metalworkthis lot is subject to a social integration clause, the implementation of which is indicated to the CCAC.
Partitions - Dubbing - False Ceilingsthis lot is subject to a social integration clause, the implementation of which is indicated in the CCAC. This lot includes 3 possible additional services (PSE)
Interior joinery - layout - furniturethis lot is subject to a social integration clause, the implementation of which is indicated in the CCAC. This lot includes 1 possible additional service (PSE)
Wall and floor coverings / Painting - Signagethis lot is subject to a social integration clause, the implementation of which is indicated in the CCAC. This lot includes 3 possible additional services (PSE)
HVAC - Plumbingthis lot is subject to a social integration clause, the implementation of which is indicated to the CCAC.
stage equipmentThis lot is divided into 3 optional tranches
Electricity - cfo - CFAthis lot is subject to a social integration clause, the implementation of which is indicated to the CCAC.
Elevatorelevator installation work