Engineering Planning Work Phases 2-8.
The Zoologischer Garten Halle GmbH is planning the construction of the new entrance building, the construction of a subsequent mountain trail and the construction of a climbing and adventure world.
There are documents for planning phase 1 as well as pro rata for LP 2. The currently estimated construction costs (KG 200 to 400) amount to 1.2 million EUR net.
It is planned to implement the project with funding from the GRW funding program. In addition, application documents (corresponding to ZBAU) must be prepared by 10/2019 at the latest. Subsequently, the construction-related examination is carried out by the BLSA. The trail is to be completed by the end of 2023.
The subject of the tendered contract are pro rata services of the civil engineering planning of the service phases 2-8 according to Part 3 Section 3 Engineering Planning §§ 43 i. V. m. Annex 12 HOAI 2013.
The services are ordered in stages / optional. Initially, only the pro rata services of phases 2-3 will be awarded to the contract. Stepwise / optional it is planned to commission the LP 4, then the LP 5-7 and then the LP 8. An unconditional legal right to commission the further services does not exist.
It is pointed out that the client has provided some services himself and has commissioned a project controller. Therefore, not all work phases are commissioned at 100%.