The subject of the contract to be awarded is the delivery and installation of the loose furniture in accordance with the specifications for the Ecole primaire européene de l'école Edward Steichen (LESC) described in Part C of the tender documents. The school building, manufactured in a modular design, is a two-story building with a partial basement. The building will be ready for operation on September 4, 2020 at the beginning of the 2021 school year. All services in this specification must be completed and ready for use by then. The loose furniture is to be understood as an important component of the educational concept of the LESC school. The place of performance is the school campus in Reuler.
The subject of the contract to be awarded is the delivery and installation of the loose furniture in accordance with the specifications for the Ecole primaire européene de l'école Edward Steichen (LESC) described in Part C of the tender documents. The school building, manufactured in a modular design, is a two-story building with a partial basement. The building will be ready for operation on September 4, 2020 at the beginning of the 2021 school year. All services in this specification must be completed and ready for use by then. The loose furniture is to be understood as an important component of the educational concept of the LESC school. The place of performance is the school campus in Reuler.