The construction project involves renovation and modernization work on the 3rd and 4th floors in the Catholic Clinic in Mainz. During the renovation, operation continues on the floors not affected.
- 2300 m medical gas piping;
- 8 pc area control box;
- 320 gas outlets DIN;
- Exchange of existing ETAK with set up emergency care.