Attic conversion and conversion of the listed building (built in 1907). The school complex currently comprises 4 full floors.
These will be partially renovated in the course of the construction project. The primary school is currently 3- fast and is to be extended by a whole train
Become.
The currently unused attic will be expanded accordingly.
The construction measures are carried out in sections and during ongoing school operations
Attic conversion and conversion to all-day care of the primary school Heilingbrunnerstraße 3, Bad
Reichenhall
The listed primary school (built in 1907) was supplemented by an extension in 1955. The school complex comprises four fully used
Floors (basement-2. OG). These will be partially renovated and converted in the course of the construction project.
After the ground floor was completed in 2021, the remaining 1st floor, as well as the basement and 2nd floor will be renovated or rebuilt from 2023.
In order to ensure all-day care and to expand the school, the previously unused attic will also become classrooms.
Expanded. The school is to be made barrier-free and will receive an elevator.
The primary school Heilingbrunnerstraße 3 consists of a total of one contiguous building, whose parts of the building, however, consist of
different years.
The entire building complex is a listed building.
1) Main building (1907) and annex (1955)
- 5-geschossig (UG-2. OG+DG)
- Solid construction, roof wooden construction
- façade length gable side: approx. 25 m
- façade length eaves side: approx. 65 m
- Roof type: hipped roof
2) Hipped roof
- Roof pitch approx. 50 ° degrees
- Roof area/m2: approx. 2000 m2
- Ridge height (acc. to OK 0.00): approx. 26 m
- Eaves height (acc. to OK 0.00): approx. 13.5 m
The renovation and conversion work will be carried out during ongoing school operations.
The following dates are planned for the advertised services:
- Attic 01.07.2024 to 26.07.2024
- 2nd floor 05.08.2024 to 06.09.2024
- Basement 02.10.2023 to 27.10.2023