This project was to source an Ultrapure Water System to supply ASTM D5127 E1.3 water at a maximum capacity of >2000 litres per hour to ISO 5 cleanrooms for Silicon and III-V semiconductor device processing.
This project was to source an Ultrapure Water System to supply ASTM D5127 E1.3 water at a maximum capacity of >2000 litres per hour to ISO 5 cleanrooms for Silicon and III-V semiconductor device processing.