As a vital part of the rehabilitation process for patients at Sunnaas Hospital Trust, a pool is used for activities that help patients return to a normal everyday life. Damages have been detected in the pool, around the pool and in the structures under the pool that must be repaired for further operation of the facility. Numerous smaller measures are also planned in the surrounding areas in connection with the pool facility.
As a vital part of the rehabilitation process for patients at Sunnaas Hospital Trust, a pool is used for activities that help patients return to a normal everyday life. Damages have been detected in the pool, around the pool and in the structures under the pool that must be repaired for further operation of the facility. Numerous smaller measures are also planned in the surrounding areas in connection with the pool facility.
All works are described in a building engineering description according to NS3420 and are based on the tender documents as a PDF and which the contractor can use for pricing.
The contracting authority has decided to keep certain works as options that are activated if the contracting authority so wishes.