Demolition of existing building (ground floor and 1st floor) approx. 8,000m3, new construction of canopies, demolition of interior fittings, bored piles diameter, micropiles, dewatering Wellpoint system with settling and neutralisation basin, reeling wall, steel girders, excavation pit, construction site installation, concrete and
Reinforced concrete work, strip foundation, reinforcement of beams with CFRP slats, core drilling,
Openings and core drilling, walls in sand-lime brick, pointed and plastering work, prefabricated reinforced concrete staircases, reinforcement best. Reinforced concrete columns with steel angle.
Demolition of existing building (ground floor and 1st floor) approx. 8,000m3, new construction of canopies, demolition of interior fittings, bored piles diameter, micropiles, dewatering Wellpoint system with settling and neutralisation basin, reeling wall, steel girders, excavation pit, construction site installation, concrete and
Reinforced concrete work, strip foundation, reinforcement of beams with CFRP slats, core drilling,
Openings and core drilling, walls in sand-lime brick, pointed and plastering work, prefabricated reinforced concrete staircases, reinforcement best. Reinforced concrete columns with steel angle.