Construction work for highways, roads | Tenderlake

Construction work for highways, roads

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
11 November 2020
Closing Date:
15 December 2020
Location(s):
DEE0C Salzlandkreis (DE Germany/DEUTSCHLAND)
Description:
OD Beesenlaublingen BA 2 and 3

Expansion of the Beesenlaublingen thoroughfare.

Coarse quantities component general services

site equipment

Traffic safety

Clearing work

- approx. 1 950 m 2 Upgrading farm roads, asphalt construction;

- approx. 650 m 2 Production of construction roads, asphalt construction.

Coarse quantities component road construction LSBB

- approx. 7545 m 2 Pick up asphalt paving;

- approx. 5 925 m 2 Pick up paving;

- approx. 75 m 3 Remove banquets;

- approx. 195 m 3 Remove topsoil;

- approx. 3 350 m 3 Loosen soil;

- approx. 435 m 2 Making banquets;

- approx. 990 m 2 Cover topsoil;

- Create approx. 235 m hollows and trenches;

- Create approx. 350 m connection pipe DN 150 plastic, including earthworks;

- Create approx. 91 street gullies;

- create approx. 2105 m of seepage line with seepage pipeline;

- approx. 550 m 3 Create frost protection layer 0/32;

- approx. 700 m 3 Create 0/32 gravel base course;

- approx. 7 270 m 2 Create a hydraulically bound base course 15 cm thick;

- approx. 7 220 m 2 Create asphalt base layer AC 32 TN, thickness 24 cm;

- approx. 7 210 m 2 Make asphalt binder AC 16 BS, thickness 6 cm;

- approx. 7 205 m 2 Create asphalt surface course AC 11 DS, thickness 4cm;

- make approx. 215 m concrete stone borders, round borders;

- create approx. 60 m bus shelves;

- Make approx. 2 205 m of plaster strips in 1, 2 and 3 rows;

- approx. 525 m 2 Restore concrete pavement.

Produce marking and signage

Large quantities of component ancillary systems City of Könnern

- approx. 170 m 2 Pick up asphalt paving;

- approx. 245 m 2 Record concrete fastening;

- approx. 3 510 m 2 Pick up paving;

- approx. 145 m 2 Record plate fastening;

- approx. 100 m 2 record unbound fastening;

- take up approx. 2,400 m of shelves;

- approx. 800 m 3rd Remove topsoil;

- approx. 2,300 m 3 Loosen soil;

- approx. 80 m 2 Making banquets;

- approx. 1,875 m 2 Cover topsoil;

- Create approx. 255 m of pits and trenches paved

- Create approx. 200 m connection pipe DN 150 plastic, including earthworks;

- create approx. 11 street gullies;

- create approx. 70 m drainage channel;

- approx. 600 m 2 Create 0/32 gravel base course;

- approx. 1 525 m 3 Create frost protection layer 0/32;

- approx. 41 m 2 Create asphalt base course AC 16 TD;

- produce approx. 2,368 m of concrete stone borders, high and round borders;

- make approx. 1,375 m concrete stone borders, low borders;

- approx. 5 605 m 2 Make concrete pavement;

- approx. 56 m 2 Restore natural stone pavement;

- approx. 140 m 2 Manufacture grass grids;

- approx. 175 m 2 Manufacture rolling gravel;

Install support brackets, palisades, stairs and railings

Coarse quantities component civil engineering pedestrian crossing

- approx. 20 m earthworks trench protective pipes;

- lay approx. 20 m protective pipes;

- set 2 cable ducts;

- Approx. 48 m of earthwork trench cable.

Large quantities of component lighting

- approx. 112 m earthworks cable trench lighting;

- Approx. 1185 m of earthworks, cable trenches, multi-width parallel power lines.

Coarse quantities component Measures tool management

- RW channel L 149;

- 3 500 m 3 Make pipeline trenches;

- 4 450 m 2 Make shoring for trenches;

- 2 050 m 3 Supply soil replacement material;

- Create 330 m of pipeline DN 300 PP;

- create 300 m pipeline DN 400 PP;

- Create 360 m pipeline DN 500 PP;

- make 23 t inspection manholes from concrete DN 1000;

- Remove or dam 630 m pipeline up to DN 200 and DN 300.

RW canal side streets

- 560 m 3 Make pipeline trenches;

- 730 m 2 Make shoring for trenches;

- 410 m 3 Supply soil replacement material;

- Create 145 m of pipeline DN 300 PP;

- Make 6 inspection manholes from concrete DN 1000;

- Make 2 inspection shafts made of plastic DN 600;

- Remove or dam 205 m pipeline up to DN 150 to DN 300.

Rainwater house connections

- 720 m 3 Make pipeline trenches;

- 1 600 m 2 Make shoring for trenches;

- 510 m 3 Supply soil replacement material;

- create 350 m pipeline DN 150 PP;

- Remove or dam 300 m pipeline up to DN 150.

Laying the sewage pressure pipe

- 1 400 m 3 Make pipeline trenches;

- 1,000 m 3 Supply soil replacement material;

- Deliver and lay 1 010 m PE 100 RC pipe 160 x 14.6;

- Deliver and install 5 pieces of gate valve for waste water;

- Deliver and install 2 cleaning and control boxes for waste water;

- Make 1 pc prefabricated manhole made of concrete DN 2000;

- Make 1 pc prefabricated manhole made of concrete DN 1500;

- Make 1 pc.pressure line end shaft made of plastic DN 1000.

Laying control cables

- Lay 1,020 m of control cable for the AG.

Rehabilitation of the SW sewer

- Remove 20 shaft covers;

- Remove 60 shaft parts;

- Delivery and installation of 40 manhole parts;

- Deliver and install 20 manhole covers.

Coarse quantities Component Measures Mitnetz Strom

- Approx. 1,861 m of earthworks, cable trenches, new installation of power cables.

Coarse quantities of component measures Midewa

- Approx. 275 m earthworks relocation of drinking water pipeline.

Download full details as .pdf
The Buyer:
Landesstraßenbaubehörde Sachsen-Anhalt Regionalbereich West
CPV Code(s):
45233100 - Construction work for highways, roads