Expansion of the Beesenlaublingen thoroughfare.
Coarse quantities component general services
site equipment
Traffic safety
Clearing work
- approx. 1 950 m
- approx. 650 m
Coarse quantities component road construction LSBB
- approx. 7545 m
- approx. 5 925 m
- approx. 75 m
- approx. 195 m
- approx. 3 350 m
- approx. 435 m
- approx. 990 m
- Create approx. 235 m hollows and trenches;
- Create approx. 350 m connection pipe DN 150 plastic, including earthworks;
- Create approx. 91 street gullies;
- create approx. 2105 m of seepage line with seepage pipeline;
- approx. 550 m
- approx. 700 m
- approx. 7 270 m
- approx. 7 220 m
- approx. 7 210 m
- approx. 7 205 m
- make approx. 215 m concrete stone borders, round borders;
- create approx. 60 m bus shelves;
- Make approx. 2 205 m of plaster strips in 1, 2 and 3 rows;
- approx. 525 m
Produce marking and signage
Large quantities of component ancillary systems City of Könnern
- approx. 170 m
- approx. 245 m
- approx. 3 510 m
- approx. 145 m
- approx. 100 m
- take up approx. 2,400 m of shelves;
- approx. 800 m
- approx. 2,300 m
- approx. 80 m
- approx. 1,875 m
- Create approx. 255 m of pits and trenches paved
- Create approx. 200 m connection pipe DN 150 plastic, including earthworks;
- create approx. 11 street gullies;
- create approx. 70 m drainage channel;
- approx. 600 m
- approx. 1 525 m
- approx. 41 m
- produce approx. 2,368 m of concrete stone borders, high and round borders;
- make approx. 1,375 m concrete stone borders, low borders;
- approx. 5 605 m
- approx. 56 m
- approx. 140 m
- approx. 175 m
Install support brackets, palisades, stairs and railings
Coarse quantities component civil engineering pedestrian crossing
- approx. 20 m earthworks trench protective pipes;
- lay approx. 20 m protective pipes;
- set 2 cable ducts;
- Approx. 48 m of earthwork trench cable.
Large quantities of component lighting
- approx. 112 m earthworks cable trench lighting;
- Approx. 1185 m of earthworks, cable trenches, multi-width parallel power lines.
Coarse quantities component Measures tool management
- RW channel L 149;
- 3 500 m
- 4 450 m
- 2 050 m
- Create 330 m of pipeline DN 300 PP;
- create 300 m pipeline DN 400 PP;
- Create 360 m pipeline DN 500 PP;
- make 23 t inspection manholes from concrete DN 1000;
- Remove or dam 630 m pipeline up to DN 200 and DN 300.
RW canal side streets
- 560 m
- 730 m
- 410 m
- Create 145 m of pipeline DN 300 PP;
- Make 6 inspection manholes from concrete DN 1000;
- Make 2 inspection shafts made of plastic DN 600;
- Remove or dam 205 m pipeline up to DN 150 to DN 300.
Rainwater house connections
- 720 m
- 1 600 m
- 510 m
- create 350 m pipeline DN 150 PP;
- Remove or dam 300 m pipeline up to DN 150.
Laying the sewage pressure pipe
- 1 400 m
- 1,000 m
- Deliver and lay 1 010 m PE 100 RC pipe 160 x 14.6;
- Deliver and install 5 pieces of gate valve for waste water;
- Deliver and install 2 cleaning and control boxes for waste water;
- Make 1 pc prefabricated manhole made of concrete DN 2000;
- Make 1 pc prefabricated manhole made of concrete DN 1500;
- Make 1 pc.pressure line end shaft made of plastic DN 1000.
Laying control cables
- Lay 1,020 m of control cable for the AG.
Rehabilitation of the SW sewer
- Remove 20 shaft covers;
- Remove 60 shaft parts;
- Delivery and installation of 40 manhole parts;
- Deliver and install 20 manhole covers.
Coarse quantities Component Measures Mitnetz Strom
- Approx. 1,861 m of earthworks, cable trenches, new installation of power cables.
Coarse quantities of component measures Midewa
- Approx. 275 m earthworks relocation of drinking water pipeline.