Erdgaslieferung 2023/2024
is advertised
- the supply of 18 acceptance points (metering points), of which 17 acceptance points according to the standard load profile (SLP customers) and 1 acceptance point according to registering performance measurement (RLM), which will be supplied with H-gas for the period from 01.01.2023, 6:00 a.m. to 01.01.2024, optionally until 01.01.2025, 06:00 a.m. The contract ends without the need for termination.
- the supply of a bio-natural gas content of 10 % ("bio natural gas10") to the collection point "Shared Accommodation Hotel Post".