The contract has as its object the supply of MT Panels for various Primary Cabins of Edyna divided into n. 4 lots called below: LOT 1 PLANT CP SASSARI - rfq_2519; LOT 2 CP TEL PLANT - rfq_2522; LOT 3 PLANT CP TYROL - rfq_2523; LOT 4 PLANT CP PONTE MARLENGO - rfq_2524.
The consistency of the supply and the necessary activities are listed in the Technical Specifications.
MAIN PERFORMANCE: SUPPLY
LOS - LOT 1 (A) - PLANT CP SASSARI - rfq_2519MT PANEL IN GAS SF6 AT 24 KV AND 25KA - CP SASSARI PLANT
LOS - LOT 2 (B) - CP TEL PLANT - rfq_2522MT PANEL IN SF6 GAS AT 24 KV AND 25KA – CP TEL SYSTEM
LOS - LOT 3 (C) - PLANT CP TYROL - rfq_2523MT PANEL IN THE AIR AT 24 KV AND 25KA - CP TIROLO PLANT
LOS - LOT 4 (D) - CP PONTE MARLENGO PLANT - rfq_2524MT PANEL IN GAS SF6 AT 24 KV AND 25KA - CP PONTE MARLENGO SYSTEM