New construction of the triple sports hall in Mauerstetten, outdoor facilities
A new sports campus with a sports hall and outdoor facilities will be built in Mauerstetten.
In the basement the building consists of a 3-field hall with equipment room, 3 double changing rooms and 2 multi-purpose rooms, each approx. 160 m 2 which can also be accessed externally via a deep courtyard. On the ground floor there are the outside changing rooms, several office rooms as well as the grandstand with a sports club for up to 400 people and a catering kitchen.
The outdoor facilities are divided into the car park to the north of the hall and the outdoor facilities assigned to the hall with a spacious forecourt and escape routes around the hall.
Earthworks: 950 m 3 Loosen soil, 4,500 m 2 Loosen building ground 1 300 m 3 Load and apply topsoil.
Drainage: 200 m 3 Excavation of pipe trenches, 220 m of various pipe diameters 130 m of various drainage channels.
Lighting: 200 m 3 Installation of earthworks, 400 m of cable lines and empty conduit 13 existing mast lights.
Road construction work: 1 900 m 2 various coverings including structures and edging.
Built-up area: 315 m 2 Create basement ceiling with green roof.
Foundations: 18 m 3 Excavation and concreting work, single and strip foundations.
Equipment / furnishings: 30 bicycle hangers, 16 bollards and traffic signs.
Greening work: 1 100 m 2 various green areas including completion maintenance.