Sports hall construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
18 September 2020
Closing Date:
15 October 2020
Location(s):
DE27B Ostallgäu (DE Germany/DEUTSCHLAND)
Description:
New construction of the triple sports hall in Mauerstetten, outdoor facilities

A new sports campus with a sports hall and outdoor facilities will be built in Mauerstetten.

In the basement the building consists of a 3-field hall with equipment room, 3 double changing rooms and 2 multi-purpose rooms, each approx. 160 m 2 which can also be accessed externally via a deep courtyard. On the ground floor there are the outside changing rooms, several office rooms as well as the grandstand with a sports club for up to 400 people and a catering kitchen.

The outdoor facilities are divided into the car park to the north of the hall and the outdoor facilities assigned to the hall with a spacious forecourt and escape routes around the hall.

Earthworks: 950 m 3 Loosen soil, 4,500 m 2 Loosen building ground 1 300 m 3 Load and apply topsoil.

Drainage: 200 m 3 Excavation of pipe trenches, 220 m of various pipe diameters 130 m of various drainage channels.

Lighting: 200 m 3 Installation of earthworks, 400 m of cable lines and empty conduit 13 existing mast lights.

Road construction work: 1 900 m 2 various coverings including structures and edging.

Built-up area: 315 m 2 Create basement ceiling with green roof.

Foundations: 18 m 3 Excavation and concreting work, single and strip foundations.

Equipment / furnishings: 30 bicycle hangers, 16 bollards and traffic signs.

Greening work: 1 100 m 2 various green areas including completion maintenance.

Download full details as .pdf
The Buyer:
Gemeinde Mauerstetten
CPV Code(s):
45212225 - Sports hall construction work