As part of the external development of the NBG Dietenbach, pipeline work for district heating and drinking water is being carried out. The route crosses the Dreisam, after which the construction section leads through the street "Am Silberhof" to the B31. On the Lehen side, first through a field to the southern end of the street "Im Zinklern". An approx. 150m long access road has to be built here. On both sides of the Dreisam, construction site equipment areas are needed for a heavy-duty crane, provision of flood barriers, etc. For cyclists, a bypass must be set up around the BE area.
The district heating and drinking water pipelines will be laid in an open trench. The crossing of the Dreisam as well as the dams will be carried out in the protective pipe and also open as the first measure in summer 2024.
- Demolition and restoration of surfaces 800 m²
- Excavation: approx. 2500m³
-Pipeline construction: Drinking water DN 500 GGG – 450m
District heating – KMR DN 250, single and double pipe – 450 tm
Development of BG Dietenbach: Dreisam crossing Am Silberhof/Im Zinklern – earthworks and pipeline construction
Title District Heating:
Civil engineering and pipeline construction work on district heating:
• The pipelines are laid in an open trench.
• Line length: approx. 900 m
• Pipeline type: Plastic casing pipe mainly as a single pipe as well as double pipe in sections
• Nominal diameter: DN 250
• Medium pipe: steel pipe
• Schutzrohr DN800 (ca. 45m)
• Thermal insulation: composite insulation made of PUR rigid foam
• Casing pipe: plastic (PE-HD)
• Transport medium: water
• Nenndruckstufe: PN 16
• Operating temperature flow: 95 °C
• Operating temperature return: 55 °C
• Network monitoring system: Nordic
• Additional electrical and data cables will be laid
• Earthworks, pipelines and road works
o Traffic safety
o Road construction: Demolition and restoration of road and pavement surfaces in the area of the pipeline trenches (approx. 400m²)
o Pipeline trenches, earthworks (approx. 1250 m³)
Title drinking water:
- General work
the Nachweisleistungen
- Earthworks, pipelines and road construction works
o Traffic safety
o Road construction: Demolition and restoration of road and pavement surfaces in the area of the pipeline trenches (approx. 400 m²)
o Pipeline trenches, earthworks and excavation pits (approx. 1250 m³)
- Pressure pipeline work drinking water PN16 (pipeline construction)
o Production of DN500 GGG pipeline approx. 450 m
o Production DN500 WKG pipe approx. 6 m
o Schutzrohr DN700 (ca. 45m)