The subject of the contract are construction works consisting in the renovation and construction of municipal roads (basic scope and optional scope), i.e.: 1) Renovation of Poznańska Street in Zielona Góra; 2) Renovation of Zawada - Szkolna Street in Zielona Góra; 3) Renovation of Zawada – Poznańska Street in Zielona Góra (covered by the option right referred to in point 3.5 of the SWZ); 4) Construction of Karminowa Street in Zielona Góra (stage II); 5) Construction of Kremowa Street in Zielona Góra; 6) Construction of Oliwkowa Street in Zielona Góra. A detailed description of the subject of the contract is included in Annex I.2 to the SWZ and in the documents referred to in point 3.4.
1. The subject of the contract should be executed in accordance with the design documentation and Technical Specifications for the Execution and Acceptance of Works contained in Annex I.5 to the SWZ. 2. The Contracting Authority informs that in this
Pursuant to Article 441(1) of the PPL, the contract provides for the exercise of the right of option. The type, maximum value and circumstances of exercising the option are determined by the documents referred to in points 3.3-3.4
SWZ and model agreement, constituting Annex I.3 to the SWZ. 3. The Contracting Authority informs that for the scopes specified in points 3.2.1)-3) of the SWZ, the cost estimate (measurement) remuneration was adopted on the basis of cost estimates
offer contained in Annex I.4 to the SWZ, and for the ranges specified in points 3.2.4)-6) SWZ – lump sum remuneration. 4. Annex I.5 to the SWZ also contains bills of quantities for
scopes of works specified in points 3.2.4)-6) of the SWZ. The Ordering Party informs that the above-mentioned bills of quantities are only an auxiliary document - the quantities given in the bill of quantities are not the basis for the valuation of the subject of the contract
for the Contractor, and only have the purpose of determining the technology of execution of works. In order to make a full valuation of works, each Contractor is obliged to read the documentation before submitting the offer
design, STWiOR and the provisions of this SWZ. 5. The Contractor shall provide a guarantee for the executed subject of the contract for the works covered by the contract for a period of min. 36 months and warranty for defects in works for a period exceeding
warranty of 6 months. Note: The additional guarantee for works (warranty extension period) is subject to scoring in accordance with the tender evaluation criteria set out in point 31.2. SWZ.