Framework agreement with order form road works program.
- realization of a plan with estimate and scope of work (start and end of work area on google view);
- pavement sawing, scarification, planing, en-engravings;
- trimming;
- earthworks;
- carrying out purges;
- creation of a ditch;
- supply and installation of curbs and gutters of all types (A, T, etc.);
- supply and laying of paving stones;
- supply and installation of pipe diameter 200 and 300 concrete and PVC;
- removal and refitting of borders A2 / T2 / T3;
- removal and refitting of curbs P1;
- realization of impregnation, layers of cure;
- supply and implementation of severe bitumen;
- supply and implementation of bituminous concrete 0/10;
- realization of single-layer gravelled impregnation;
- upgrades of manholes, sanitation grids, key locks, PTT, drains;
- adjustment of shoulders, adjustment of slopes;
- construction of concrete works on the side of the road;
- realization of horizontal and vertical signage;
- supply and installation of resin pavers;
- topographic survey package (1/2 day or day);
- realization of concrete border poured in place and channel poured in place;
- realization of concrete implementation (m
- resumption of hard shoulder of Scotland;
- carrying out manual weeding;
- realization of raised platform;
- supply and installation of a grid manhole;
- supply and installation of inlet manhole;
- supply and installation of concrete manhole;
- supply and installation of GRP pipes;
- supply and installation of PVC pipes;
- supply and installation of cast iron pipes;
- night work.
- realization of a plan with estimate and scope of work (start and end of work area on google view);
- pavement sawing, scarification, planing, en-engravings;
- trimming;
- earthworks;
- carrying out purges;
- creation of a ditch;
- supply and installation of curbs and gutters of all types (A, T, etc.);
- supply and laying of paving stones;
- supply and installation of pipe diameter 200 and 300 concrete and PVC;
- removal and refitting of borders A2 / T2 / T3;
- removal and refitting of curbs P1;
- realization of impregnation, layers of cure;
- supply and implementation of severe bitumen;
- supply and implementation of bituminous concrete 0/10;
- realization of single-layer gravelled impregnation;
- upgrades of manholes, sanitation grids, key locks, PTT, drains;
- adjustment of shoulders, adjustment of slopes;
- construction of concrete works on the side of the road;
- realization of horizontal and vertical signage;
- supply and installation of resin pavers;
- topographic survey package (1/2 day or day);
- realization of concrete border poured in place and channel poured in place;
- realization of concrete implementation (m
- resumption of hard shoulder of Scotland;
- carrying out manual weeding;
- realization of raised platform;
- supply and installation of a grid manhole;
- supply and installation of inlet manhole;
- supply and installation of concrete manhole;
- supply and installation of GRP pipes;
- supply and installation of PVC pipes;
- supply and installation of cast iron pipes;
- night work.
- realization of a plan with estimate and scope of work (start and end of work area on google view);
- pavement sawing, scarification, planing, en-engravings;
- trimming;
- earthworks;
- carrying out purges;
- creation of a ditch;
- supply and installation of curbs and gutters of all types (A, T, etc.);
- supply and laying of paving stones;
- supply and installation of pipe diameter 200 and 300 concrete and PVC;
- removal and refitting of borders A2 / T2 / T3;
- removal and refitting of curbs P1;
- realization of impregnation, layers of cure;
- supply and implementation of severe bitumen;
- supply and implementation of bituminous concrete 0/10;
- realization of single-layer gravelled impregnation;
- upgrades of manholes, sanitation grids, key locks, PTT, drains;
- adjustment of shoulders, adjustment of slopes;
- construction of concrete works on the side of the road;
- realization of horizontal and vertical signage;
- supply and installation of resin pavers;
- topographic survey package (1/2 day or day);
- realization of concrete border poured in place and channel poured in place;
- realization of concrete implementation (m
- resumption of hard shoulder of Scotland;
- carrying out manual weeding;
- realization of raised platform;
- supply and installation of a grid manhole;
- supply and installation of inlet manhole;
- supply and installation of concrete manhole;
- supply and installation of GRP pipes;
- supply and installation of PVC pipes;
- supply and installation of cast iron pipes;
- night work.