New Markkleeberg Youth Hostel

Lot 401 - Construction power supply and lighting

Create a construction power system on construction site and maintain it for the duration of the construction period of approx. 27 months. Among other things, the following must be provided with different durations of use within the construction period:

- 1 pcs meter connection cabinet 173 kVA;

- 1 pc main distributor 173 kVA;

- 1 pcs crane connection cabinet 86 kVA;

- 1 pc container connection cabinet 86 kVA;

- 4 pcs construction site distribution cabinet 44 kVA;

- 13 pcs construction site socket distributor 22 kVA;

- approx. 450 m of NAYY-J cable in different dimensions;

- 450 m heavy rubber hose line H07 RN-F 5 G 2.5 or 4 sq mm;

- 1 piece outdoor construction lighting system with approx. 4 wooden poles equipped with up to 2 LED construction spotlights IP54 and approx. 300 m cable H07 RN 3 G 2.5 sqmm

- Create, maintain and dismantle approx. 14 pcs indoor construction lighting system, including with an LED tube up to approx. 50 m long, section by section according to construction progress