The client intends to renovate and expand fire and rescue station 1 in Rostock. The project is divided into 4 construction phases. The preparatory measures will be implemented in the construction phases 0 + 1 that are now to be carried out.
The service includes in detail, among other things
Wastewater development - 280 m pipes up to DN 250
- 7 concrete shafts, DN 1000,
- 1 pc. Manhole polymer concrete DN 2500,
- 1 pc.light liquid separator NS 3-650,
Rainwater development - 165 m pipes DN 160/200
- 180 m concrete pipes DN 400-600,
- 4 concrete shafts, DN 1000,
- 2 concrete shafts, DN 1200,
- 1 cistern DN 2500,
- 1 pc storage canal 280 m
Conduits and cable ducts - 2 200 m multi-pipe system PVC DA 140
- 13 cable ducts 1 500 x 1 500 x 1 000 mm
6,000 t soil disposal / recycling.