Lot 1: the designation of a multidisciplinary team composed of an architect, a stability engineer, a special engineering engineer, an ILL adviser, an acoustician and a soil expert, responsible for the complete study and monitoring of the works, for the demolition of existing structures and the construction of a housing building including two transit dwellings.
Lot 2: the appointment of a health safety coordinator for demolition and the construction of a housing building comprising, among other things, two transit dwellings.
Architecture and Engineering Study MissionComprehensive study and monitoring of the works, for the demolition of existing structures and the construction of a housing building comprising, inter alia, two transit dwellings.
Health and safety coordinationHealth Safety Coordinator on demolition and construction of a housing building comprising two transit dwellings.