As a replacement for the 5t open-bearing crane in the Bahntechnik Center Hägendorf, two new 7.5 t crane systems are to be procured. Three additional systems can be ordered optionally. The crane systems are used to move rail and switch components with a maximum total length of 36 m and a weight of approx. 3.5t in the warehouse. Due to the length of the rail parts, special lifting equipment is required, the weight of which from today's perspective is up to 2.0t.
The overall execution of the project refers to the following points (not exhaustive):
- engineering
- Project planning
- Dismantling and disposal of the existing crane system
- delivery
- Editing
- Commissioning incl. CE marking, all permits required for operation
- documentations
- Training, maintenance, servicing and repair during the warranty period according to the price table
For a provisional delivery schedule, see para. 4.6.
As a replacement for the 5t open-bearing crane in the Bahntechnik Center Hägendorf, two new 7.5 t crane systems are to be procured. Three additional systems can be ordered optionally. The crane systems are used to move rail and switch components with a maximum total length of 36 m and a weight of approx. 3.5t in the warehouse. Due to the length of the rail parts, special lifting equipment is required, the weight of which from today's perspective is up to 2.0t.
The overall execution of the project refers to the following points (not exhaustive):
- engineering
- Project planning
- Dismantling and disposal of the existing crane system
- delivery
- Editing
- Commissioning incl. CE marking, all permits required for operation
- documentations
- Training, maintenance, servicing and repair during the warranty period according to the price table
For a provisional delivery schedule, see para. 4.6.