The contract includes the delivery, construction and commissioning of a new installation for the production and distribution of cooling at the new Sintef premises at Torgardsvegen 12. The system will supply the necessary cooling to the hydraulic system serving full-scale rigs for the mechanical load testing of oil pipes and power cables, in addition to various small-scale rigs. It must also include its own refrigerating machine for the production and distribution of ice water for air cooling of the compressed air system, refrigerating machine room and hydraulic room located in the cellar.
The contract includes the delivery, construction and commissioning of a new installation for the production and distribution of cooling at the new Sintef premises at Torgardsvegen 12. The system will supply the necessary cooling to the hydraulic system serving full-scale rigs for the mechanical load testing of oil pipes and power cables, in addition to various small-scale rigs. It must also include its own refrigerating machine for the production and distribution of ice water for air cooling of the compressed air system, refrigerating machine room and hydraulic room located in the cellar.