The district of Nürnberger Land is planning the new construction of the Geschwister-Scholl-Gymnasium in Röthenbach.
,
The service levels 1-5 of the project management service profile according to the project management contract HAV-KOM, specified by the additional contractual provisions (ZVB-PS) to the project management contract, are commissioned - step by step. Only the implementation of the VgV procedures for the object planning of buildings and interiors, specialist planning of technical equipment HLS, technical equipment ELT and structural planning are omitted, as these are already carried out parallel to this procedure. As an additional service, a PKMS is to be provided.
The district of Nürnberger Land is planning the new construction of the Geschwister-Scholl-Gymnasium in Röthenbach. A general renovation has already been envisaged, but it has turned out in the context of the relevant planning that a new building is more economical.
,
The construction of the new classroom wing for the grammar school was decided. The aim here is a structural implementation of the space program for the replacement building of the grammar school, taking into account the local heating center in the existing partial basement. The new building will be planned on the site of the existing building. The demolition of the existing building will be supervised by the architect.
,
The overall space program for the grammar school is available and will be made available. The overall measure Schulzentrum Röthenbach is divided into 5 components, whereby components 1 to 4 were already completed in 2022. The last component 5 - classroom wing Gymnasium - is now the subject of this tender.
,
In the basement of the building to be demolished there is a local heating supply centre. This must remain. The development of the local heating supply centre and the connection of the new part of the building is the subject of the planning contract. As part of a feasibility study, which is attached to the tender documents, different variants were examined, in which a new building while retaining the local heating supply centre was considered. From this, the preferred variant 1 has formed. The local heating supply centre must be retained, the floors above must be dismantled and the plant must be structurally clad in the building. The classroom wing is to be moved away and completely rebuilt. A three-storey new building is expected to be built.
,
An increase by a fourth floor should already be taken into account in planning, at least statically.
,
A new pedagogical spatial concept is to be implemented (clusters and open learning landscapes).
,
The client wants to take on a role model function, so that the aspects of sustainability and in particular energy-efficient construction take on a high priority here. Great importance should be attached to the energy concept. The other sustainability criteria should also be taken into account, even in demolition if possible.
,
Within the framework of Lph. 2, the client wishes a variant investigation with regard to the comparison of solid construction to timber construction. A timber construction may be considered. However, the final decision on this must be taken by the political body. The variants of solid construction and timber construction are therefore to be compared by the architect in Lph. 2 including cost assessment. Subsequently, the decision is made by the political body.
,
It is important that the adjacent buildings of the school complex remain in operation. This must be taken into account during implementation. There is also a narrow access situation in the present case, which means that logistics are more difficult. This must also be taken into account in the context of planning and execution.
,
The total costs of the measure are around EUR 35 million gross (KG 200-700 incl. demolition).
,
Planning is to begin immediately after the assignment (expected summer 2023). The funding application must be submitted by 15.10.2024. The input by the project controller is included in the basic services, including the input for the later proof of use. Regardless of the funding application, the existing classroom wing is to be demolished as early as 2024. The students are already outsourced to containers.
,
Construction is scheduled to begin at the beginning of 2025, with completion or use scheduled for the beginning of the school year (autumn) 2028.
,
In the present case, it is particularly important for the client that the "Guidelines for Safety in Teaching" (RISU) are complied with. The property planner must pay particular attention to this. The requirements of the KUVB (Kommunale Unfallversicherung Bayern) go beyond the "normal" requirements.
,
Furthermore, the keeping and presentation of the construction diary is particularly important to the client. Section 8.5 of the ZVB stipulates that the construction diary must be kept in accordance with the guidelines issued for state construction measures and that it must be submitted to the client every fortnight. The construction diary must be handed over after completion of the construction work.
,
The service levels 1-5 of the project management service profile according to the project management contract HAV-KOM, specified by the additional contractual provisions (ZVB-PS) to the project management contract, are commissioned - step by step. Only the implementation of the VgV procedures for the object planning of buildings and interiors, specialist planning of technical equipment HLS, technical equipment ELT and structural planning are omitted, as these are already carried out parallel to this procedure. As an additional service, a PKMS is to be provided.