The object of the order is the reconstruction of the building of the Starachowicki Cultural Center (now “Park Kultury”) in the field of improving utility functionality, including works of the general construction and installation industry — including plumbing, solar, ventilation and air conditioning, electrical engineering and telecommunications, photovoltaic and landscaping of part of the site by the building.
The object of the order is the reconstruction of the building of the Starachowicki Cultural Center (now “Park Kultury”) in the field of improving utility functionality, including works of the general construction and installation industry — including plumbing, solar, ventilation and air conditioning, electrical engineering and telecommunications, photovoltaic and landscaping of part of the site by the building.
The order shall specify in detail the “Description of the object of the contract” and technical documentation (design documentation with the subject matter and technical specifications for the performance and acceptance of construction works) as annexes to this SWZ.
The Contracting Authority does not require the Contractor to make a local vision for acquaintance
With the area where the subject of the contract will be implemented as a necessary condition for participation in the proceedings. The property belongs to the category of public facilities and is public, but before making a vision, please contact the Ordering Party to determine the date and scope of visual inspection. Contact person for local vision: Jerzy Ambroży — Referat of Investment Realization tel (041) 273-82-96, email: inwestycje@starachowice.eu.
The Contracting Authority does not require and does not allow to check the documents necessary for the implementation of the receipt available on site with the Ordering Party.
The order is funded by the program “Revitalization — a better life in Starachowice, a city that found an idea for itself”.
General requirements:
The Contractor shall be obliged to act in accordance with the principles of technical knowledge, to consult the description of the object of the contract with due care.
Before submitting an offer, the Contractor is obliged to report to the Contracting Authority any noted deficiencies and errors in the construction and enforcement project concerning the description of the object of the contract, and the correction of which will determine the surrender of the object of the contract within the meaning of the construction facility may spontaneously perform an economic or technical function. The above will allow the Ordering Party to modify the content of the SWZ before submitting bids.
Before submitting an offer, the Contractor shall report to the Contracting Authority any doubts or imprecise arrangements in the SWZ and the contract template which
For its part, they may provide for the lack of opportunity to sign a contract under the terms indicated in those documents.
The Contractor shall be fully liable by accident, as well as for damage to private property and legal entities caused by his action or oversight related to the implementation of this contract, also for damage to the underground armament.
The Contracting Authority shall require employment by the Contractor or subcontractor on the basis of an employment relationship, within the meaning of Article 22 (1) of the Act of 26 June 1974. The labour code of persons performing the indicated activities related to the execution of the contract, i.e. the performance of general works and all families. installation works.