Renovation of the outdoor swimming pool in Esslingen-Berkheim:
The NRF is about 1 870 m
The following measures are to be implemented in the course of the upcoming refurbishment:
- total renovation of the inner and outer pools (stainless steel lining),
- Renovation of the foyer, changing room and sanitary area,
- Complete renewal of technical building installations (heating, ventilation, sanitary, electric and bathing water technology),
- barrier-free access,
- energetic upgrading of the building envelope.
The work is expected to start in September 2019 - May 2021.
- cold water distributor with 9 outlets - 1 pc.,
- WCs - 13 St.,
- Urinals with non-contact rinsing release - 6 pcs,
- Washbasins with electronic fittings - 10 pcs,
- Showers - 23 St.,
- outdoor shower and frost-proof outdoor fixtures,
- drainage channels - approx. 50 running meters,
- rainwater drainage system - approx. 150 running meters,
- drinking water installation - 1 090 running meters