Flooring work
The building is divided into four halls and ancillary areas. Hall A is a triple sports hall (27x45x7m), which is planned as a meeting place. Hall B (12x12x4m) is used as a gymnastics hall and Hall C & D are one-and-a-half technical halls (18x36x5m). In the ancillary areas there is an equipment room, a medical room, a cleaning product/storage room and a changing room for each part of the hall. The changing room block is divided into a women's and a men's area as well as storage rooms.
The flooring work (2.BA) will take place in the adjoining rooms of Halls C & D.
2-K Epoxy-Dichtgrundierung UZIN PE 460: 446,570 m2
Filling with levelling compound UZIN NC 170: 446,570 m2
PVC flooring, plank 203.2mm x 1219.2mm: 446.570 m2
Skirting board: 556,650 m
Clean-off mats: 5,000 pieces