Volume of work: Asphalt stripping 2,500 m3 Excavated material 8,200 m3 Removal of excavated material 27,400 m3 Trench excavation 13,400 m3 Discharge PAH 3,800 to Filler materials 25,500 m3 Asphalt 7,500 to Granite edging 4000m Pavers file 7000m Pavers surface 10.300m2 Sheet piling 1.168.500 kg
Volume of work: Asphalt stripping 2,500 m3 Excavated material 8,200 m3 Removal of excavated material 27,400 m3 Trench excavation 13,400 m3 Discharge PAH 3,800 to Filler materials 25,500 m3 Asphalt 7,500 to Granite edging 4000m Pavers file 7000m Pavers surface 10.300m2 Sheet piling 1.168.500 kg