Construction work for buildings relating to education and research | Tenderlake

Construction work for buildings relating to education and research

Contract Value:
EUR 401K - 401K
Notice Type:
Contract Notice
Published Date:
17 May 2021
Closing Date:
14 June 2021
Location(s):
DE80O Ludwigslust-Parchim (DE Germany/DEUTSCHLAND)
Description:
New Edith-Stein-Schule with sports hall in 19288 Ludwigslust; Lot 5.01 — outdoor facilities

New Edith-Stein-Schule as a primary school with orientation level, nursery and sports hall in 19288 Ludwigslust, Friedrich-Naumann-Allee 20; Lot 5.01 — outdoor facilities.

Terrain editing

The terrain drops by about 40-50 cm to the north. The existing holdles/ditches of the former parking site drainage are filled with the soil to be removed. Due to the preventive noise protection, small earth walls of 100 cm in height are erected and planted with ground covers and shrubs.

pick up and bring track

Between the driveway to the teacher's parking lot and the schoolyard entrance (fire brigade and rescue route), a pick-up and transfer lane is to be set up on the public property.

squares, farms

Parts of the schoolyard and the entrance area are fastened with higher-quality concrete pavement.

pitches

At the side of the sports hall, 10 parking spaces are planned for the teachers.

Sports area

Along the western boundary of the property (to the castle's visitor parking lot), a 60 m long track made of threshing floors is arranged. The total track length with a 3 m start-up and a 17 m run is 80 m. At the end of the outlet, a long jump pit joins.

In addition to the sporting activities, a larger play and climbing area is planned for playing and the break activities, which will be filled with sand/gravel as fall protection.

Enclosures

Lockable gates to the schoolyard and the green classroom are installed on both sides of the school building and are built as a fencing to the outside with adjacent bar fences.

Rainwater

In principle, the surface water should remain on the site. The discharge of surface and roof water is envisaged with rigole infiltration on the school's premises. If the system is overloaded after heavy rain events, rainwater should be

Emergency overflow should be introduced into the 2nd order ditch located north-east of the property line.

Dirty water

At the property boundary, the transfer tray for dirty water is rebuilt to merge the dirty water pipes from the grease trap at the boundary of the property. The connection cable to the introductory point is to be renewed to a length of approx. 12 m

cistern

For garden irrigation and demonstration of rainwater harvesting, a cistern with a volume of approximately 15 m3 is installed. Due to the high level of groundwater, the cistern

Provided from a concrete tank.

Heavy current systems

The production of cable trenches for lighting is to be carried out via the outdoor facilities.

General internals

2 benches, waste bins, bicycle storage with rectangular handles, triangular awning

Special internals

In the area of the air-to-water heat pump, a housing consisting of sound-absorbing wooden elements, which is 2.0 m high, is constructed.

Vegetative tillage

For the lawn sowing, the planting of the earth walls, the planting of the house bed areas, the paved topsoil on site must be reused.

plants

For maintenance reasons, the creation of bed surfaces with shrubs and floor coverers is limited to the perimals and the eastern facade side of the sports hall.

A grid of 6 small-crowned trees is planned in the foreground and the entrance area. Other tree plantations will be placed near the play areas, at the seat on the northern boundary of the property and in the garden part east of the sports hall.

Download full details as .pdf
The Buyer:
Diakoniewerk Neues Ufer gem. GmbH
CPV Code(s):
45000000 - Construction work
45112700 - Landscaping work
45112720 - Landscaping work for sports grounds and recreational areas
45112723 - Landscaping work for playgrounds
45214000 - Construction work for buildings relating to education and research