Installation of a mechanical supply and exhaust air system (approx. 8,000 cbm/h) with heat recovery as the roof unit and laying the ventilation ducts per floor in the area of suspended ceilings/installation of air outlets.
1 pcs ventilation system
approx. 745 sqm galvanized ventilation ducts with fittings
approx. 1,150 m spiral seam pipes
approx. 224 pcs air outlets