As part of the measure, the existing building, "Festhalle Ilmenau", will be renovated in accordance with monument protection law, rebuilt and modernized
The "state of the art". The implementation takes place during ongoing operations, in 2 construction phases.
The services of this course include: Road and sewer construction
demolition work
- approx. 300 m² granite paving
- approx. 100 m² asphalt surface
- approx. 350 m² of concrete paving
- approx. 100 m of rainwater pipes up to DN 315
- 3 pcs street entrances
- 5 m box channel
- 2 pcs inspection shafts DN 400
drainage works
- approx. 130 m of rainwater pipe up to DN 315
- 4 pcs street entrances
- 6 m box channel
- 2 pcs inspection shafts DN 1000
Cable digging (earthworks only)
- approx. 200 m for house connections electrical energy, telecom, internet
Road construction
- approx. 800 m² basic expansion of concrete paving
- approx. 325 m² concrete pavement renovation by repaving
- approx. 225 m² thorough expansion with granite paving 9/11
- 11 m edging wheelie bin space with L-elements
Furnishing
- 4 pcs benches
- 8 pcs Bike hangers
- 16 pcs bollard
- 2 pcs recycle bins
- 2 pcs Foundations for info steles