The object of the order is the tasks:
— Task No 1 “Construction of geothermal and biomass heating plant in Sieradz together with the gT-2" congestion hole - in the formula “design and build”.
— Task No 2 “Construction of a cogeneration module with capacity of 0.9 MWe and 1,1 MWt to support the operation of the geothermal and biomass heating plant in Sieradz” — in the formula “design and build”.
In the scope of Task No 1 — “Construction of a geothermal and biomass heating plant in Sieradz together with a gT-2" congestion hole: design (executive project) and process of implementation of facilities for the generation and distribution of thermal energy from renewable sources in the north-west part It sits, based on the existing GT-1 geothermal hole, the planned new GT-2 well, planned gas cogeneration and the connection of the source to the existing district heating plant system at 2 West Street.
In the scope of Task No 2 “Construction of a cogeneration module with capacity of 0.9 MWe and 1,1 MWt supporting the operation of the geothermal and biomass heating plant in Sieradz”: the design and construction of a gas source of cogeneration (CHP) at the site of the Thermal Power Company in Sieradz. The planned venture implies heat and electricity generation in association. The gas cogeneration module will be built in a sound-absorbing container. The electrical power of the module will be 0.9 MWe. The new cogeneration module will work with the existing coal heating plant (CM-1) and the newly designed geothermal and biomass heat plant (CGB).
A detailed description of the contract can be found on the tender documentation posted at: https://pecsieradz.e-zp.finn.pl