The subject of the contract is the construction of a bridge over the San River along with the construction of access roads and an intersection with the provincial road No. 886 (Królowej Bony Street). The order will be carried out on the basis of the decision on the permit for the implementation of the road investment (ZRID), ref. AB.6740.9.2.2023 No. 1/23 of 31.03.2023.
The subject of the contract is the construction of a bridge over the San River along with the construction of roads
access roads and intersections with the provincial road No. 886 (Królowej Bony Street).
The order will be executed on the basis of a decision on the permit for implementation
road investment (ZRID) ref. AB.6740.9.2.2023 No. 1/23 of 31.03.2023
The scope of the contract includes:
1) construction of municipal road no. G117077R, Jana III Sobieskiego Street, single-carriageway
(1/2) from the existing intersection with the municipal road no. G 117077R, Żwirki i street;
Wigury/Zamkowa to the end of the development with a length of 628 m (in this respect
the length of the designed bridge in the new course of Gajowa Street was taken into account)
together with the infrastructure,
1) extension of the provincial road No. 886 dual carriageway (2/2) on the section from
intersection with A. Mickiewcza street to the designed roundabout and single carriageway
(1/2) from the designed roundabout to the end of the 300 m long study, together with
Infrastructure
2) construction of a section of the municipal road of Aleksandra Rybickiego Street (new mileage) class L
from km 0+000,00 to km 0+331,98 including infrastructure,
3) extension of the section of the old road municipal road No. G 117064R, ul.
Rybickiego class L from km 0+000.00 to km 0+182.32 and 0+000.00 to km 0+043.80
together with the infrastructure,
4) construction and reconstruction of pedestrian, bicycle and bicycle paths,
5) construction and extension of intersections with infrastructure,
6) construction of 11 individual exits, reconstruction of 6 individual exits and
reconstruction of 2 public exits and construction of 2 public exits
7) construction of a bridge over the San River with a total length (including wings);
abutments) 275.40 m and 17.90 m wide, including infrastructure and construction
permanent and temporary bridge supports in the new course of the municipal road,
8) construction of a road ditch ending with a drop well from km 0+000-0+128.32
DG G117064R with a culvert under the exit to the pedestrian and bicycle path No. 2 o
diameter 40cm and length 10m,
9) construction, extension, reconstruction and demolition of the storm water drainage network,
10) construction, reconstruction and demolition of medium and low voltage power grids,
11) construction of cable power network for road lighting together with
a bridge structure,
12) construction, extension, reconstruction and demolition of low-pressure gas network,
13) construction, extension, reconstruction and demolition of the heating network,
14) construction, extension, reconstruction and demolition of the water supply network,
15) construction, extension, reconstruction and demolition of the sanitary sewerage network,
16) construction, extension, reconstruction and demolition of telecommunication equipment,
17) construction of a technological channel,
18) felling trees and shrubs colliding with the planned scope of works;
Road
19) planned plantings of trees and shrubs.
A detailed description of the subject of the contract specifies:
1. design documentation (construction design, detail engineering and
Technical specifications for the execution and acceptance of construction works, bills of quantities
works – auxiliary),
2. decision on the permit for the implementation of the road investment ref. AB.6740.9.2.2023 No.
1/23 of 31.03.2023
3. Draft provisions of the public procurement agreement together with
Attachments.
- annexed to the specifications (available in separate
files)