Reconstruction and expansion of the Chieming elementary and middle school
Painting work inside BA II
- approx. 400 m² protective cover windows/doors
- approx. 400 m² protective cover floor
- ca. 310 flm Umfassungszargen abkleben
- approx. 3600 m² preparation of old wall surfaces
- approx. 3600 m² of interior wall surfaces on existing
- Paint approx. 50 m² interior wall surfaces on new plaster
- Paint approx. 630 m² window reveals
- paint approx. 100 m² interior wall surfaces up to 4.00 m height
- Paint approx. 120 m² of wall surfaces in the stairwell
- approx. 250 m² overhaul paint for reinforced concrete floor surfaces
- create approx. 150 m² of coloured surfaces
- attach approx. 100 m² photo wallpapers
- approx. 800 running meters acrylic joints
- approx. 65 running metres of coating of enclosure steel frames
- approx. 240 running metres of overhaul paint for enclosure steel frames
- approx. 52 m² paint tubular radiators
- approx. 364 m² plate radiators paint
- approx. 46 m² floor coating