Engineering, manufacture, delivery, installation and pre-commissioning of 6 gas turbine turbo compressor packages (inclusive of auxiliary equipment), inclusive of factory acceptance testing, vendor support on installation, commissioning, trial operation including performance test, and assistance / fine tuning following start-up of the stations facility. It is the intention that the contract shall include spare parts required for commissioning and start-up of the unit, plus cover for two years of operation. Furthermore it is the intention to include defects notification period, and training of TAP personnel. Long term support and maintenance agreement shall be offered as an option.
The compressors with auxiliary equipment to be delivered shall form a complete functional unit once installed, comparable to a skid mounted compressor unit.
These works are part of the greater gas transmission network projects intended to transport gas from Azerbaijan to Italy and from there into the European gas network.