Adjustment of the Lys terraced to class CEMT Vb on a section of 1 800 m in Comines.
The works consist of dredging and deepening excavation, earthworks, bank protection and the implementation of straight walls.
This project involves the creation of a 2-lane road, a Raveel road, the construction of a sluice (bridge), the extension of the existing sluice on the Morte-Lys and the development of a disposal site. Which will be the subject of a landscaping type urban park.
- preparatory work: felling of trees, clearing of trees, removal of a sewage pipe (Ipalle pipeline), demolition of roads and roads,
- digging of a new channel, dredging and deepening of the riverbed, reinforcement of banks in embankments, placement of excavated land on a nearby site, reinforcement of the banks under the Comines bridge and nearby (straight banks) ), installation of dolphins, landscaping with the creation of a park, development of the islet, construction of a waterfront road with cycle lane and roundabout, platform on the bank for the bike path, miscellaneous structures: floodwater supply sluices, sluices to connect the islet, extension of the sluice of the Dead Lily,
- construction of a roadway under the bridge ramp of Fort Street, including the construction of a buffer pond,
- resumption of drainage and rejects.