Plaster work.
1.BA - IMC:
- to a small extent additions to an existing thermal insulation composite system with mineral wool insulation,
- about 50m
- approx. 450 m
- approx. 30 m
2.BA-ITS:
- to a small extent additions to an existing thermal insulation composite system with mineral wool insulation,
- approx. 250 m
3.BA - GYN:
- to a small extent additions to an existing external plaster,
- approx. 30 m
- approx. 400 m
- approx. 45 m