Gastroenterology and pulmonology at the Hochrhein Hospital will be equipped with new endoscopy technology.
Gastroenterology and pulmonology at the Hochrhein Hospital will be equipped with new endoscopy technology.
The CE markings shall be attached as an attachment to the submission of the offer.
It is to offer the latest generation product with CE marking at the time of bidding.
Material selection and execution standards All materials of the offered products must be selected in such a way that they meet the hygienic and technological requirements of a hospital and are permanently protected against corrosion.
High operational reliability and service-friendly operation and equipment of all parts to be used and serviced are required. All relevant provisions of the health and health
monitoring authorities, as well as the relevant accident prevention and safety regulations.
Rolls of chassis, carriages, etc. must not leave stains on the floor covering. They must be fastened unscrewed.
All surfaces must be disinfectant-resistant.
All devices that are connected to on-site cables must be supplied complete with the required connection cables and fasteners (flanges, plug-in connections, etc.). The connection to the cables or other on-site cables is done via the AN. If the contractor is not authorized to make the connection himself due to a lack of licence or lack of qualified specialists, he must entrust a corresponding company to connect. These costs are settled with the unit price.
All device-side cable routing must be concealed within the design profiles. The penetration holes shall be provided with glued rubber grommets. If the cables are not already inserted in production, tie wires must be inserted for assembly.
In areas with open design profiles where concealed cable routing is not possible, the cables must be protected in their own cable routing with the smallest possible cross-section.
The junction boxes or control boxes must be installed invisibly in cladding areas. In principle, the entire cable routing with can layers must be submitted as a plan document for release.
Quotation supplements
The offer must be backed up with binding prospectuses or equivalent documents that are matched to the SOW. In the upper-right corner of the brochure are the position numbers of the
write SOW.